This kitchen had served the house well for a long time, but the oak doors, green worktops and tiled splashback were showing their age. The owners wanted something clean and modern, with better lighting and a layout that made the most of a long, narrow room.
- Brighton Hill, Basingstoke
- Kitchen refit
- 4 weeks start to finish
We took the old kitchen out completely, back to bare walls. The ceiling was plastered and fitted with new inset spotlights, then the new units, worktops, splashback, lighting and flooring went in. We decorated throughout before handing it back.
Everything was done by our own team, so there was one point of contact from the first day to the last. From start to finish the job took four weeks.

Before and after


What we did
- Stripped out the old units, worktops, tiles and flooring
- Plastered the ceiling and fitted inset LED spotlights
- Fitted the new units, worktops and glass splashback
- Plumbing and electrics for the sink, hob, oven and appliances
- Under-cabinet lighting and new oak-effect flooring
- Decorated the whole room